Understand dam behaviour.
Make informed asset decisions.
Instrumentation and dam monitoring support for concrete and embankment dams. Measure seepage, pressure and movement, improve existing monitoring systems and access the data your engineering team needs.
Why monitor a dam?
Dams respond to changing reservoir levels, temperature, rainfall and ageing. Monitoring helps owners and engineers understand this behaviour and identify changes that require investigation.
Together, measurements of movement, pressure, seepage and temperature provide evidence for dam surveillance, maintenance planning and rehabilitation decisions.
Identify changes early
Track trends and unusual readings so your team can investigate and respond under the dam’s monitoring and response procedures.
Support safety reviews
Build a consistent record of dam behaviour to complement inspections and engineering assessments.
Prioritise maintenance
Use monitoring evidence to inform investigations, target repairs and plan upgrades across your asset portfolio.
Concrete and Embankment Dams

Concrete Dams
Concrete dams include gravity and arch structures. Monitoring helps engineers understand how the dam body, foundations and abutments respond to water pressure, temperature and other loads.
Typical measurements include:
- Concrete temperature and reservoir level
- Movement of the dam body and foundations
- Crack and joint opening
- Foundation uplift and pore water pressure
- Seepage and drainage flows

Embankment Dams
Embankment dams use compacted earth, rockfill or a combination of materials, with a core or facing that limits water movement. Monitoring focuses on the embankment, foundations and drainage systems.
Typical measurements include:
- Settlement and lateral movement
- Pore water pressure within the embankment and foundations
- Seepage flows and changes in drainage behaviour
- Reservoir levels and their relationship to instrument readings
Improve the monitoring you already have
An existing monitoring system represents years of investment and valuable historical data. As instruments, cables and readout equipment age, owners need to understand which measurements remain reliable and where improvements are needed.
Metric Dynamics can help scope instrumentation checks, replacement equipment and monitoring upgrades, working with your dam engineer and specialist suppliers.
Assess existing instrumentation
Review instrument records, investigate missing or inconsistent readings and arrange functional checks to identify equipment requiring attention.
Improve data collection and access
Assess opportunities to connect compatible instruments to modern data loggers, automate readings and provide remote access to monitoring records.
Support rehabilitation works
Supply instrumentation and coordinate installation support for dam repairs, strengthening and upgrades, with monitoring requirements agreed alongside your engineering team.
Maintain reliable monitoring
Plan routine system checks and coordinate troubleshooting, repairs and manufacturer calibration services where applicable.
Upgrades can proceed in stages, retaining suitable instruments while improving coverage, reliability and access to data.
Measure the changes that matter

Seepage monitoring with V-notch weirs
Measure collected seepage and drainage flows to establish trends and identify changes that need investigation.
V-notch weirs and compatible water-level sensors can support manual or automated readings. Reviewing flow alongside reservoir levels and rainfall helps engineers interpret changes in context.
Movement monitoring with pendulums
Direct and inverted pendulums provide a reference for measuring horizontal displacement within concrete dams.
Manual readouts or compatible automated systems help engineers track movement over time and compare it with reservoir levels, temperature and established behaviour.

Pressure monitoring with piezometers

Measure pore water pressure and, in suitable installations, foundation uplift pressure to support assessment of dam and foundation behaviour.
Instrument selection depends on the measurement range, installation conditions, access and required reading method. Existing hydraulic, pneumatic and electrical systems require a compatibility review before changing readout or logging arrangements.
Complete the monitoring picture
Specify for the environment.
Maintain for the long term.
Reliable monitoring depends on the complete installation, including sensors, cables, connections, power and access for maintenance.
Materials and corrosion resistance*
Consider water chemistry, chloride exposure, immersion and the compatibility of sensor bodies, cables and fittings when selecting equipment.
Installation and accessibility
Protect cables and connections from moisture and physical damage. In addition, plan mounting positions and access so routine checks remain practical.
Data quality and maintenance
Document instrument details, calibration factors and reading methods. Furthermore, check unexpected results and maintain loggers, power supplies and communications.
*Corrosion-resistant instrumentation and monitoring of concrete deterioration are separate requirements. Chloride ingress or reinforcement corrosion monitoring needs a specifically selected measurement approach.
Connect monitoring to your dam safety plan
Monitoring is most useful when each measurement addresses a defined concern. Connect instrument locations and reading frequencies to identified risks, expected behaviour and agreed response procedures.
Consistent records support safety reviews, maintenance planning and updates to the asset risk register. They also help owners document investigations and the reasons behind maintenance or upgrade decisions.
| Reference | Role in monitoring |
|---|---|
| Applicable regulator requirements | Owner obligations and dam safety processes. |
| Relevant ANCOLD guidance | Surveillance and dam safety management practices. |
| Owner’s monitoring plans | Measurements, frequencies, triggers and responsibilities. |
| Manufacturer guidance | Installation, operation and maintenance. |
Monitoring supports compliance and engineering assessment. Instrumentation alone does not establish dam safety or demonstrate compliance.
Dam monitoring FAQs
Yes. We can review instrument details, available records and readout arrangements to assess equipment and upgrade options. Compatibility depends on the instrument type, condition and signal or reading method.
Some can. Compatible electrical instruments may connect to modern logging systems, while hydraulic, pneumatic or mechanical instruments may need additional equipment or continued manual readings. We assess the options before recommending an upgrade.
We can help with instrumentation supply, monitoring upgrades and installation support around the requirements set by your engineering team. This can include retaining suitable instruments and replacing or supplementing equipment where needed.
Your team can review trends, compare readings with agreed criteria and investigate changes alongside reservoir levels, rainfall, temperature and site activities. These records support engineering assessments, maintenance planning and asset management decisions.
We can help coordinate system checks, troubleshooting, repairs and manufacturer calibration services where applicable. The scope depends on the equipment, site access and support required.
Metric Dynamics is based on the Central Coast NSW, supporting projects across Australia. Site attendance, equipment delivery and specialist support are arranged to suit the project.
Discuss your dam monitoring requirements
Whether you need individual instruments, help with an existing system or support for a planned upgrade, we can help identify the next step.
Share your instrument schedule, available drawings or a brief description of the issue.
